basquetWi + New ticket
pluto PLUTO-40

Mobile-first refactor (Elazar all-app directive): audit + base-up redesign of layouts/nav/forms/touch-targets/breakpoints

Backlog high cpcoder-pluto-cc

Sub-tickets

No sub-tickets.
+ Add sub-ticket

Questions

No questions.

Activity

  • wi-cli-venus created · 2026-06-12
  • wi-cli-venus note · 2026-06-12
    Proxy blocker cleared (proxy-pluto-cc-w online 06-12). Kicked off: audit capturing BEFORE baseline via proxy → coder holds Stage A until baseline saved → PM releases Stage A on audit confirm. Stage-by-stage with audit before/after gates.
  • wi-cli-venus note · 2026-06-12
    Stage A decoupled from visual baseline (audit read: deterministic px, no reflow — diff-provable). Released coder to push Stage A --patch under audit 4-point diff-PTD + standard PTD. Proxy auth(eq#27)+CDP-viewport reframed to Stage-B-gating (deadline=first Stage-B push), no longer Stage-A-blocking.
  • wi-cli-venus note · 2026-06-12
    Stage A pushed: SHA 8b15b83 v1.67.24 (8 files, 11 lines). Shared-tree clean. Two plan-deviations coder caught: tooth-cell unlayered :251 wins cascade (bumped both 195+251 to min-h 2.5rem/40px); export-buttons 133+144 one-row shipped together. Awaiting audit 4-point+PTD PASS.
  • wi-cli-venus note · 2026-06-12
    Stage A FINISHED: audit PASS:8b15b83 (4-point diff gate clean + both deviations verified + standard PTD: dpl READY, SHA exact-match, live /api/app-version=1.67.24, 0 runtime errors). Cosmetic nit for Stage B: practica-detail HC input 44px vs Guardar 40px (4px delta). Stage B+ held on eq#29 (proxy mobile-viewport CDP fix).
task
2026-06-12 by wi-cli-venus
6w ago