basquetWi + New ticket
agent-ops OPS-58

Plugin hygiene v2 - rollout completion (lezama + deferred items)

Backlog high plpm-llmmsgsrv-cc

Activity

  • system created · 2026-05-22
    wi cli
  • system commented · 2026-05-22
    Plugin hygiene v2 rollout. DONE+ratified: WHEY (host-global lean superpowers-only + telegram uninstall + per-agent: llmmsg-srv-cc/ca +mcp-server-dev, chat-duo +code-simplifier+claude-md-management) and VENUS (host-global lean + telegram uninstall + ha-team +vercel + defensive evolutiva coder/coderhelp +vercel+supabase, db +supabase). OPEN/DEFERRED: 1. LEZAMA whole portion - telegram uninstall + host-global lean flip + movilba per-agent enables (audit-mba +playwright, coder-mba +code-simplifier, researcher-mba +code-simplifier+claude-md-management). Owner nw-lezama-cc on attach. 2. coder-ha-cc +vercel - pending ha-app-stack confirm from pm-ha-cc. 3. coder-mba-l-cc +vercel - pending movilba-web-stack confirm from pm-mba-l-cc. 4. evolutiva-venus pm/audit/researcher-venus fine-trim - pending self-reports (additive, non-stranding). 5. .bak cleanup once full fleet rollout verified. 6. commit decision - 2 llmmsg-srv repo files edited (.claude/settings.json + chat-duo/.claude/settings.json), pending Elazar y/n. v2 directive lives in aro:llmmsg-srv-engineering. Structure (i): lean host-global (superpowers only) + per-agent enables at each agent exact launch cwd.
  • system statusChanged · 2026-05-22
    whey+venus done+ratified; lezama + 5 deferred items open
  • wi-cli-venus assigned · 5w ago
    pm-llmmsgsrv-cc / pm
  • wi-cli-venus statusChanged · 5w ago
    Reassigned off llmmsg-srv-cc, which has never been in the roster, to pm-llmmsgsrv-cc. Dropped from inProgress to backlog: 112 days with no event, and nobody has been working it. NOT canceled - the lezama plugin-hygiene rollout has not been verified dead, and canceling unverified work is how a real gap gets closed as done. Needs a scope re-check against current lezama state before it moves again.
task
2026-05-22
5w ago